The Claw The Claw Column and Beam Single Step Clips
Home Specs Benefits Sample Order News and Press
<--! About Us Contact Us Email Us -->

 

 

Benefits  |  Save Time

Design Enhancement!
"THE CLAW" Prevents Slippage During Installation

Fireproof Structural Steel Plus Create a "Finished Enclosure" Both in a Single Step...Beams or Columns

  •  No Inspection
  •  No Damage Repairs
  •  No Slop to Clean Up
  •  50% Less Material
 
Why you should choose "THE CLAW"?

Columns
Frame and erect 1st coded layer in 4
minutes or less, with only one man.
No need to pay to spray 8 areas of steel.


Increase production by 65%.

Use "THE CLAW" and coded
board to cover 2 drops
+ 1 bottom flange.

Cover 3 areas for same result.

Save Time - You won't believe how much time
you can save by choosing "THE CLAW"!

How much time do you think you would save framing 20 columns?
Let us compare what you would need.
With Steel Studs
With "THE CLAW"
Tools:
Supplies:
Tools:
Supplies:
Ladder
80 Studs
None!
1 Carton of
"THE CLAW" Clips
Gun
160 Windows
-
-
Shear
160 Cartridges
-
-
-
160 Pins
-
-


And the operations you would have to go through.
With Steel Studs
With "THE CLAW"
Raise and distribute steel studs
80
Raise and distribute 1 carton
1
Cut 2 windows per stud
160
-
-
Plumb to flange edge each stud
80
Snap on 12 clips per column
240
Load 2 cartridges per stud
160
-
-
Load 2 steel pins per stud
160
-
-
Shoot 2 cartridges per stud
160
-
-
Close 2 windows per stud
160
-
-
Upload 2 cartridges per stud
160
-
-
Up ladder 1 time per stud
80
-
-
Down ladder 1 time per stud
80
-
-
Move equipment 1x per stud
20
-
-
 
1300
 
241

Production of Fireproofing Increased by 65% Including a Decorative Enclosure.

Why should you use "THE CLAW" again?

Claw InternationalBecause you gain these benefits.

  1. Snap-On 12 Clips by hand.
  2. No tools, bare hands!
  3. 12 operations per column.
  4. Total time: 75 sec per column.
  5. 50% less material.
  6. No loss of usable floor area.
Get A Grip On:
    Material Costs
    Production Time
    Labor Expenses

The Construction 
Specifications Institute
Claw International
P.O. Box 241646, Apple Valley MN, 55124
Phone: (317) 726-6350 • Fax: (651) 905-3766 •
corey@clawintl.com

Home | About Us | Specs | Specs - PDF Format | Specs - AutoCad Drawings
Benefits | Sample | Order | News & Press | Contact | Email Us

Reed Construction Data
http://www.clawintl.com    
©2007 Claw International   .